Show Answer

 

The correct answer is D.

OBJ-7.1: The change authority is a person or group responsible for authorizing a change. For a standard change, the change might be pre-authorized for all future changes of the same type. For an emergency change, this might be the IT director. Regardless of their named position, when they are authorizing a change based on the organization’s defined level of authority, they are the change authority.

Hide Answer